Demarcation committee vs. adjudication committee: what each one does

A weathered wooden post marked with hand-painted numbers standing in an open field.

If you've sat through a tenure programme inception meeting, you've heard both terms used almost interchangeably, usually by someone from the donor side who hasn't run a field campaign. Field staff don't make that mistake twice. Demarcation and adjudication are two different jobs, done by two different bodies, on two different timelines, and mixing them up in a work plan is how a programme ends up with boundary walks happening before anyone has agreed who's entitled to walk them.

What a demarcation committee does

A demarcation committee is the body that physically marks where one parcel ends and the next one starts. In most systematic regularization programmes this is a village-level or block-level group: a local chief or elder, two or three neighboring occupants, sometimes a surveyor or paralegal attached from the implementing agency. Their job during the boundary walk is narrow and concrete. They stand at corner points, confirm that this fence line, that drainage channel, or this row of trees is where the neighbors agree the boundary runs, and they sign off on it.

No ownership question is settled at this stage. A demarcation committee doesn't rule on whether the person standing at the corner has a valid claim to the land behind it. It marks the line that both sides are willing to point to.

This is also the stage where a lot of programme time gets eaten up, because walking every boundary in an unsurveyed settlement parcel by parcel, with a committee present at each one, is slow. It's the reason a pre-drawn structure and plot layer matters before the committee ever shows up: giving demarcation committees a candidate line to confirm or adjust is a different job than asking them to invent one from an aerial photo and a tape measure.

What an adjudication committee does

Adjudication is the quasi-judicial step. An adjudication committee, sometimes called a land tribunal, a claims committee, or a dispute resolution panel depending on the jurisdiction and the programme's legal framework, exists to decide who holds the right to a given parcel once its boundary is settled. This is where competing claims get worked through: an inheritance dispute between siblings, an overlap between a customary occupant and someone holding an old paper title, a widow's claim that was never recorded because her name never appeared on the original allocation.

Adjudication committees usually sit after the demarcation phase, hear objections during a public notice period, take testimony from witnesses, and issue a finding that gets entered into the adjudication record before it moves to first registration. They need legal standing that a demarcation committee doesn't require. In a lot of frameworks the adjudication committee includes someone with formal legal training or a government land officer, precisely because its decisions can actually be appealed in a way a demarcation sign-off generally can't.

Where community land committees fit in

The phrase "community land committee" gets used loosely enough that it's worth being precise. In most programmes it's the standing local body that provides local knowledge and legitimacy to both processes, sometimes the same people who sit on the demarcation committee, sometimes a parallel group of ward representatives or customary leaders. They vouch for who's who in the settlement, flag claims that outsiders wouldn't know to question, and carry social weight that makes a boundary walk or a tribunal finding stick once it's published. Think of them as the connective tissue between demarcation and adjudication, present at both stages but without a separate sign-off of their own.

For programme staff, the practical implication is sequencing. Demarcation needs a boundary to confirm. Adjudication needs that boundary already settled before it can rule on who holds it. A base layer of structure footprints and candidate plot lines drawn from a recent VHR pass, the kind of starting map Cadastre Update produces for an unsurveyed area, gives the demarcation committee something concrete to walk against instead of a blank parcel map, which shortens the gap before adjudication can even begin.

If your programme is still starting tenure work from a blank map, it's worth seeing what a drawn one looks like.