Blog

  1. Field notes: the courtyard the imagery called one plot and the family called three

    A field note on why a single rooftop footprint in VHR imagery can hide three households, and what that means for the adjudication table.

  2. Demarcation committee vs. adjudication committee: what each one does

    Demarcation committees walk boundaries on the ground. Adjudication committees decide who holds the right. How the two split the work.

  3. Prioritizing informal settlements when the survey budget won't cover all of them

    A practical scoring approach for sequencing informal settlement mapping and tenure regularization when ground survey funds only reach part of the backlog.

  4. Structure footprint vs. candidate plot boundary: what's the difference?

    A GIS officer's guide to structure polygons and candidate plot boundaries, and why a tenure programme needs both before adjudication starts.

  5. Field notes: the hamlet that didn't exist on any map until the pass came back

    A field-notes account of a sixty-structure hamlet absent from every map, and how one VHR pass gave a tenure project its first drawn layer.

  6. Assigning provisional plot numbers before registration

    A field-tested way to number parcels for adjudication before survey, so the registry can take over without renumbering everything.

  7. Reconciling a community sketch map with a VHR orthomosaic

    How GIS officers line up hand-drawn community sketch maps with a VHR orthomosaic, and where to let each document do its job.

  8. What is a parcel fabric in cadastral GIS?

    Parcel fabric defined, how it differs from a parcel layer, and where it fits in a cadastral GIS stack for tenure regularization work.

  9. Field notes: the day a draft layer got the room arguing

    Field notes from an adjudication session where a drawn plot layer got the community arguing about boundaries instead of whether to map at all.

  10. What is the social tenure domain model (STDM), and where does it fit in land recording?

    A plain explainer on the Social Tenure Domain Model: what it records, who built it, and how it fits alongside structure and plot mapping work.

  11. Sporadic vs systematic land registration: how agencies choose

    A plain-language look at how land agencies decide between sporadic and systematic registration, and what tips the choice.

  12. What is a cadastral index map, and why land agencies keep one

    A plain explanation of the cadastral index map: what it shows, how it differs from the parcel record itself, and why registries rely on it daily.

  13. Customary tenure vs statutory tenure: what it means for a cadastral update

    How customary land rights and statutory registration pull against each other during a cadastral update, and why the base map matters either way.

  14. Parcel vs. plot: what's the actual difference in land administration?

    Parcel and plot get used interchangeably in the field, but they mean different things in a cadastre. Here's the distinction that matters for adjudication.

  15. Fit-for-purpose land administration, explained

    What fit-for-purpose land administration means, how it differs from conventional surveying, and where the continuum of rights fits in.

  16. General boundaries vs fixed boundaries in cadastral surveying

    What the general boundary rule means for tenure regularization, how it differs from a fixed boundary cadastre, and which fits a first-pass programme.

  17. Running a community boundary validation workshop

    A field guide to planning and running a participatory boundary adjudication session for tenure regularization, from prep to sign-off.

  18. What is adjudication in land tenure regularization?

    A plain explanation of the adjudication step in tenure regularization, including public display of claims and the objection period.

← Back to Cadastre Update